Search to Grinnell College Frontdoor  
Logo Picture
Environmental Stewardship Home
Environmental Indicators
Energy and Transportation
Buildings
Landscape
Dining Services
Waste & Recycling
Campus Environmental Organizations
Photos of CERA Turbine Construction

January 25th, 2007

Footings for the turbine tower are poured Footings for the tower are poured

Turbine parts after delivery Turbine parts after delivery

Tower parts Tower parts

Building first section of the turbine Building the first section of the tower

Attaching turbine blades Attaching the turbine blades

Normie McInnis, Entegrity's field technician arrives to oversee turbine construction. Normie McInnis, Entegrity's field technician, arrives to oversee construction

Assembled tower Assembled tower

Connecting the turbine to the tower Connecting the turbine to the tower

Top portion of the turbine is attached to the tower Top portion of the tower is hoisted

Aligning the top sections Aligning the top sections

Bolting top section to base Bolting top section to base

Completed and spinning turbine Finished!

Wind Energy Home


  Academics Admission Alumni Athletics Calendar Catalog Comment Directory Library Offices Students ITS  
© 2001-2005 Grinnell College Grinnell, IA 50112-1690 Grinnell College 641-269-4000 Privacy policy and additional information.