Skip to Navigation
Home
  • Calendar
  • Make a Gift
  • Logins Downward pointing arrow icon
    • OutlookWeb
    • Pioneerweb
    • Library
    • PDID
    • eTime
    • Employee Self-Service
    • Halogen
    • Sedona
    • PioneerLink
    • Loggia
    • Bookstore
    • Drupal
  • Directory
  • Site Index

About

  • Campus Map
  • College Profile
  • College Contacts
  • Jobs

Academics

  • Academic Calendar
  • Catalog
  • Dean’s Office
  • Registrar

Admission

  • Tuition & Aid
  • Apply
  • Visit
  • At a Glance

Alumni

  • The Loggia
  • Give to Grinnell
  • Alumni Directory
  • Events

Athletics

  • Wellness
  • Prospective Students
  • Hall of Fame
  • Facilities

Libraries

  • Find it!
  • Databases
  • Find a Librarian
  • Off-Campus Access

Offices

  • Technology
  • Faulconer Gallery
  • Bookstore
  • Hours of Operation
v MORE LINKS v
The Grinnell Magazine

Deconstructing the Physical Education Center (PEC)

Home › Campus Offices › Communications › The Grinnell Magazine › Web Extras › Deconstructing the Physical Education Center (PEC)

In the fall and winter of 2010, closely following the completion of the new Charles Benson Bear '39 Recreation and Athletic Center, workers dismantled and largely recycled the College’s Physical Education Complex (PEC). You can read all about the 1971 building’s history in the Spring 2011 issue of The Grinnell Magazine. Ken Saunders, the College’s maintenance manager, meticulously documented the deconstruction process and shares these photos.

Workers remove the middle gym’s varnished maple floor.
Workers stack the floor of the PEC gym for reuse.
Workers remove the PEC gym rafters.
The former PEC gym now opens onto a blue sky.
Workers load laminated wood sections onto a truck.
Workers transport PEC parts to their new owner.
Workers raze the gym's exterior walls.
Posts of the former PEC standing alone.
Workers load a truck with concrete and break to be hauled away.
Workers remove recyclable items with a claw-equipped shovel.
Wood and iron are sorted into separate piles.
A view from the north with the razed gym on the left and the standing office sui
The remaining west wall of the office suite from the north.
Workers raze the office suite.
Workers raze the foundation walls of the PEC for recycling.
Workers sift the foundation cavity free of debris.
Workers refill the empty foundation cavity with soil.
Standing wall fragment and debris.
PEC sign with equipment and rubble in the background.
Rubble in and around the former pool.
Workers demolish the foundation of the former pool.
A small amount of rubble remains in early winter.
  • The Grinnell Magazine
    • Contact
    • Web Extras
      • Dorje Gurung
      • Extra Letters to the Editor

Office of Admission

Office of Communications
733 Broad St., Old Glove Factory 2nd Floor
Grinnell, Iowa, 50112
(641) 269-3404
Fax: (641) 269-3408
By submitting this form, you accept the Mollom privacy policy.
v Office of Communications Contact Information v
  • Copyright Statement: About this Web Site
  • Nondiscrimination policy
  • Facebook
  • YouTube
  • LinkedIn
  • Twitter