Joe Rosenfield Center

Removing casing from caisson
Block laid for Dining Pavilion from North
Laying Dining Pavilion limestone from Southwest
Laying block for Fireplace Lounge from Northwest
Laying block for Fireplace Lounge from Northwest
Laying Multi-Purpose area block from Southwest
Fireplace lounge block laid from Northeast
Insulating north wall from Northwest
Laying brick on 3rd floor from West
Laying exterior brick from Northeast
Installing south wing roof from East
Installing south exterior wall insulation from Southeast
Framing Multi-Purpose Room walls from Southwest
Installing Dining Pavillion north windows from Northwest
Installing Dining Pavillion north exterior windows from Northeast
Installing Dining Pavillion north windows from South
Installing plywood on Gallery #117 walls from North
Laying Fireplace Lounge stone from Northwest
Laying lobby floor tile
Installing wood ceiling panels in dining
Wood ceiling in dining
Curved fascia in grille area
Installing ceiling in dining pavillion
Laying tile on woodstore oven
Installation of wood ceiling of terrace
Laying brick on south extension in wall of south wing
Terrace from South
Dining Room 119A from North
Dining Room 119B and 119C from East
Dining Room 119F from Northeast
Dining Room 224 from Northwest
Lobby 208 from North
Dining Room 119F from West
Kitchen 106A from Northeast
Installing ceiling in Fireplace Lounge from West
Installing ceiling in Fireplace Lounge from Northwest
Installing rails in Study Lounge from West
E-mail Lounge from Northeast
Study Lounge from East
Dining Hall
Courtyard
Rosenfield Center from Southeast
Rosenfield Center from Southwest
Multipurpose Room 101
Multipurpose Room 101
Fireplace Lounge
Dining Pavilion from Southwest
Dining Pavilioin from South
Study Lounge 207